After deciding on the dimensions and outlining the area, all soil (and rocks!) should then be dug out. But once you get the hang of concrete pond construction, there?s no limit to where you can go from there.Concrete pond construction can be a true learning experience. So learn, build, and then build some more!. If shelves have been dug out, pour cement there, next. Since good concrete pond construction equates to having one that lasts a lifetime or longer, follow these rules of thumb to get it right ? the first time!Keep in mind that for suitable concrete pond construction, you need to pour the concrete to a thickness of four to six inches. Improper methods can lead to more money spent on maintenance, repairs, or replacement than on the cost of the initial construction. It?s best to start with a smaller pond, then if you meet with success, you can then move on to a larger project. Finally, pour cement for the top of the pond and for any coping that may be involved. After the acid treatment, apply several coats of paint made for pools or masonry sealant, allowing each coat to dry thoroughly.

Treating with muriatic acid at this stage helps prevent high pH levels in water later, which benefits fish and plants. Forms then need to be built and placed where concrete is to be poured, along with the proper placement of cut-to-fit reinforcement bars (rebar). Some other necessary items include a carpenter?s level, string, stakes, sheets of plastic, and a long two-by-four.Landscaping Tips: Concrete Pond ConstructionPosted by nick_niesen on November 1st, 2010Good concrete pond construction means not taking shortcuts.Pouring the cement in concrete pond construction should be done in one day, unless the pond is very large, and then it must be poured in sections.For digging out the area for concrete pond construction, you will need shovels, picks, a crowbar, and, of course, a wheelbarrow. After you have completed these first steps of your concrete pond Cement Ornaments manufacturers construction project, you need to let the cement cure for several days under plastic. Pour cement in the bottom of the pool first, then the sides

文章標籤
全站熱搜
創作者介紹
創作者 oopppooko 的頭像
oopppooko

oopppooko的部落格